The giant Zakum field is located centrally in Abu Dhabi's offshore area. It is then pumped through the main oil lines, which measure approximately 55km, to Zirku Island for further processing, storage and export. The Lower Zakum Oil Field was discovered in 1963 approximately 80 kilometers offshore northwest of Abu Dhabi City, and began production in 1967. The wells are tied to more than 90 existing platforms. Project: Upper Zakum Oil Field, phase 2, Abu Dhabi Scope: supply of range of manually operated and pneumatically actuated valves for use in vacuum pump station UZ750 is an artificial island located 80km off the Abu Dhabi coastline. The current 40% foreign interest is split between ExxonMobil which has a 28 percent stake, with Japan Oil Developing Co (Jodco) holding 12 percent. In April 2013, Petrofac was awarded a contract by ZADCO for the Upper Zakum, UZ750 field development. and 12.6 billion bbl of oil reserves. In November 2017, partners of the Upper Zakum field announced an agreement to increase production capacity to one million barrels per day by 2024. Yumna oil field located in Block 50 Oman at a water depth of 30m, approximately 30km offshore east Oman, is…, Bulleit oil and gas field is located at a water depth of approximately 1,200m in the Green Canyon Block 21…, Qattameya (also known as Kattameya) gas field is located at a water depth of 108m in the North Damietta offshore…, Meliwis gas field is located in the Madura Offshore PSC situated in East Java, Indonesia. Production from the oilfield began in 1982. The Upper Zakum oil field is the second largest offshore oil field and the fourth largest oil field in the world, ADNOC highlighted. The field has a productive area of about 155,673 c (63,047 ha.) Located approximately 84km north-west off the Abu Dhabi islands, Upper Zakum Oilfield has an estimated 50 billion barrels of oil reserves. Technip provided conceptual engineering and front-end engineering design for the process units on the islands, including several other facilities on the four islands. If you continue to use this site we will assume that you are happy with it. https://en.wikipedia.org/w/index.php?title=Upper_Zakum_oil_field&oldid=928421940, Pages with non-numeric formatnum arguments, United Arab Emirates articles missing geocoordinate data, Creative Commons Attribution-ShareAlike License, This page was last edited on 29 November 2019, at 01:56. Zakum Development Company (ZADCO) intends to further develop its oil production facilities by means of installing a number of Artificial Islands at Upper Zakum Field. Il se situe au large d'Abou Dabi et fait partie des plus grands gisements offshore du monde, avec une production totale (passée + future) qui devrait dépasser 20 Gbbl. The total cost of the project is expected to be$10bn and it will be sustainable for 25 years. The Habtoor Leighton Group (HLG) won a contract for the construction of the accommodation and support facilities for the artificial islands in June 2012. The islands were constructed in water depths ranging between 5m to 15m. The shallow-water Upper Zakum oil field covers an area of 1,200km² and comprises approximately 450 wells extending 7,000ft to 8,000ft below the earth’s surface. The second phase is expected to increase the production capacity by a further 150,000bpd. The Zakum telesystem; An application of large-scale SCADA systems to a major offshore oil field Journal Article Kahoul, J M - SPE (Society of Petroleum Engineers) Production Engineering; (USA) Various types of supervisory-control and data-acquisition (SCADA) systems are in use in oil fields around the world, assisting field personnel in maintaining safe and profitable operations. Operated by ADNOC Offshore on behalf of its shareholders ADNOC, ExxonMobil and Japan Oil … 2018年(平成30年)3月9日 - アラブ首長国連邦にある油田権益のうちアブダビ沖の海上油田下部ザクム油田(Lower Zakum oil field)の権益を2058年まで40年間延長。 This will add 100,000bpd in production capacity to the Upper Zakum field. The Upper Zakum oil field, located 85km northwest of Abu Dhabi, is the second largest offshore oil field and the world’s fourth largest oil field. JODCO's involvement in the petroleum industry in Abu Dhabi started in 1973 with its participation in ADMA Ltd. The shallow-water oilfield covers an area of 1,200km² and comprises approximately 450 wells, extending 7,000ft to 8,000ft below the earth’s surface. Production is currently at approximately 650KBD. miles, is held by Abu Dhabi Marine Areas Ltd. in which The British Petroleum Company has a two thirds interest. INPEX‘s Other Projects in Abu Dhabi Lower Zakum oil field It is owned by Zakum Development Company (ZADCO), a joint venture (JV) of ADNOC (60%) which acts as the operator, ExxonMobil (28%) and the Japan Oil Development Company (Jodco-12%), a wholly-owned subsidiary of INPEX. In November 2018, the Wood Group received a one-year contract extension to provide PMC services for the UZ750 project from January 2019. It is one of the largest offshore oil fields in the world. The field is a massive low-relief, east-west anticline that measures 40 kilometres in length and 28 kilometres in width. Loan Agreement Counterparty Subject Oil Field JBIC Portion (max.) In October 2015, Petrofac delivered the first two modules for ZADCO’s Upper Zakum UZ750 project. The oil field, which is the largest in the current ADMA offshore concession, has a target production of approximately 450,000 barrels of crude oil per day. ADNOC and JODCO jointly started the development work in the Field in 1978 with the production started in 1982 (at that time the interest ownership was: ADNOC 88%, JODCO 12%). UK to end support for oil and gas overseas, except in Mozambique, Japan to launch oil and gas policy reviews ahead of carbon neutral targets. The construction works are being implemented in two phases. Another innovative technology in use is the maximum reservoir contact (MRC), which reduces the number of new wells that are necessary and unlocks tighter areas in the reservoir. Production from the oilfield started in 1982. July 1985 Started production from the Umm Al-Dalkh oil field. Phase two involves the development of facilities on the four artificial islands, including wellhead controls, manifolds, crude oil process facilities, water injection and gas lift, booster gas compression facilities, oil export pumps, power generation and ancillary utilities, as well as the modification of the existing facilities. The rocks were transported to the site from quarries in the UAE. The oil field is owned by Abu Dhabi National Oil Company and operated as part of ADNOC Offshore, formerly ZADCO. Located north-west of the Abu Dhabi islands, the man-made islands were developed using new technologies, including the extended reach drilling (ERD) technology, which enables wells to be drilled vertically in the initial stages. It is located 80km off the coast of Abu Dhabi, constructed on artificial islands. The project also involves the construction of accommodation facilities for 2,150 people, alongside supporting buildings and permanent utilities such as recreational areas, a mosque and operations and drilling offices. It lies 80 kilometres northwest of Abu Dhabi city in water depths ranging from 5 to 15 metres. The UZ750 project is one of the major offshore field development projects in the UAE. The Upper Zakum Oil Field Arabic: حقل زاكوم العلوي is an oil field 84 km northwest of Abu Dhabi Islands. The first phase of the project involves the development of offshore facilities. Amec Foster Wheeler received the contract to carry out the availability and reliability study for the project. The oil field is owned by Abu Dhabi National Oil Company and operated by ADNOC Offshore. Total Waste Management Alliance (TWMA) has been contracted to design, commission and operate an advanced solids control and fluid recovery system for the project. Oil retrieved from the field flows through a pipeline network into one of the four main processing facilities for treatment. ADNOC awarded construction works to National Marine Dredging Company for building four islands in Zakum Offshore field which is located approximately 84 km North West of Abu Dhabi and 50 km from Zirku Island. The central island measuring 1,200mx600m is the biggest island on the field and houses the processing facilities, while the north, west and south islands are used as satellite platforms. As many as 22 production modules comprising a wellhead control and oil processing unit will be constructed in the the second phase. Introduction The Abu Dhabi Marine Areas Concession, originally of about 12,000 sq. The formation is composed mainly of rudistid and algal sediments, rudistid mounds having overlain and built up the topography of an The ACCROPODE II technique, with assistance provided by Concrete Layer Innovations (CLI), is being implemented to protect the northern and western islands. UPPER ZAKUM OIL FIELD The UZ750 project is one of the major offshore field development projects in the UAE. Located approximately 84km north-west of the Abu Dhabi islands, Upper Zakum Oilfield has an estimated 50 billion barrels of oil reserves. The Lower Zakum Oil Field is the lower horizons of the Zakum oil field 84 km north west of Abu Dhabi Islands. Découvert en 1965, le gisement comporte deux réservoirs : Upper et Lower. The construction of the islands involved 23.5 million cubic meter of dredging, 14 million tonnes (Mt) of rock and 13.5 million cubic feet of concrete. Construction works for the islands involved 20 million cubic metres of dredging and levelling, as well as 20 million cubic metres of ground amelioration, and used seven million tonnes of stones, artificial fabrics and concrete units for the beach protection. The Abu Dhabi National Oil Co. (ADNOC) has agreed to the transfer of rights in its Lower Zakum and Umm Shaif and Nasr offshore concessions from China National Petroleum Corp. (CNPC) to … It will provide specialist drilling services, including the handling, transfer, storage and treatment of both oil-based and water-based drill cuttings in the course of the project. Abu Dhabi National Oil Company (ADNOC), ExxonMobil Abu Dhabi Offshore Petroleum Company Limited and Japan’s INPEX Corporation (INPEX), announced, on the side lines of the Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC), an agreement to increase production capacity from the Upper Zakum oil field to 1 million barrels per day by 2024. The Upper Zakum oil field, located offshore Abu Dhabi, is the 2nd biggest overseas oil field and the 4th biggest oil area in the world. (Total Co-Financing Amount) JODCO Abu Dhabi Offshore Oil Fields (Satah Field/Umm Al-Dalkh Oil Field *2, Upper Zakum Oil Field) USD300 million (USD500 million) The four islands, which are oval in shape and measure 2,000ft to 2,600ft in diameter, were constructed from sand and rock. The Upper Zakum Oil Field, one of the largest oil fields in the world, is located approximately 80km offshore, northwest of Abu Dhabi City and has an area of 1,150km2. Petrofac Emirates, through its JV with Mubadala Petroleum and Daewoo Shipbuilding & Marine Engineering (DSME), is conducting the second phase under a $3.7bn contract. AMEC has provided project management consultancy (PMC) services for the offshore elements of the project under a $75m contract, while COWI has carried out PMC services for the construction of the islands. It was discovered in 1963 and developed by Abu Dhabi Marine Areas Ltd., a joint venture between British Petroleum and Compagnie Française des Pétroles (later Total). The production capacity of the field is set to increase to 750,000bpd, following the completion of the UZ750 Project, which is currently underway. The field produces 640,000 barrels of oil a per day (bpd). After this, they can be drilled horizontally to target reservoirs several miles away. Oil wased initially discovered in 1963 and ADNOC took the choice, at … We use cookies to ensure that we give you the best experience on our website. The total oil in place of the Zakum oil field (combined with Lower Zakum oil field is around 50 billion barrels (6711×106tonnes), and production is centered on 500,000 barrels per day (79,000 m3/d). We are working in partnership with DSME and co-ordinating more than 30 specialist sub-contractors. It is further pumped through main oil lines, measuring approximately 55km t… Currently JODCO is involved, through the Operating Company ADNOC Offshore, in the development of the Upper Zakum oil field, as well as the Satah and Umm Al Dalkh oil Fields. Oil was first discovered in 1963 and ADNOC took the decision, at its own risk, to develop the field, in 1977. The field was discovered in…, Get important industry news and analysis sent to your inbox – sign up to our e-Newsletter here, “National Petroleum Construction Co and Technip are carrying out the first phase of the project under an AED3bn contract.”. It includes the laying of 240km of subsea pipelines, 128km of subsea composite and fibre-optic cables, as well as the installation of30,000t of offshore structures, such as jackets, riser platforms, flare towers and bridges, and approximately 3,000t of islands modules and bridges. Ramboll conducted the feasibility study for the artificial islands. The civil works of the four artificial islands were completed in 2015. In April 2013, Petrofac was awarded a contract by ZADCO for the Upper Zakum, UZ750 field development. The upper reservoir horizons are known as Upper Zakum oil field. The oil field has a target production of approximately 450,000 barrels of crude oil per day. [1] There is a project close to completion to increase production to 750,000 bbl/day from Upper Zakum. Abu Dhabi National Oil Company (ADNOC) and Japan Oil, Gas and Metals National Corporation (JOGMEC; formerly JNOC-Japan National Oil Corporation) have commenced a CO 2-EOR (Enhanced Oil Recovery) study in Lower Zakum oil field offshore Abu Dhabi. The UZ750 project involves the construction of four artificial islands, which comprise a central complex that will house the processing facilities, as well as the north, south and west satellite platforms. The National Petroleum Construction Co (NPCC) and Technip are carrying out the first phase of the project under an AED3bn ($817m) contract. November 1993 Reached aggregate sales volume of 1 billion The Lower Zakum Oil Field was discovered in 1963 approximately 80 kilometers offshore northwest of Abu Dhabi City, and began production in 1967. The National Marine Dredging Company (NMDC) is responsible for the construction of the islands. Upper Zakum and Lower Zakum together are the second largest offshore oilfield and fourth largest oilfield in the world. Production and handling Upper Zakum is operated by Zakum Development Company (ZADCO) on behalf of Abu Dhabi National Oil Company (60%), ExxonMobil (28%) and Japan Oil Development Company Limited (12%). The oil field is owned by Abu Dhabi National Oil Company and operated as part of ADNOC Offshore, formerly ZADCO. The island-based infrastructure allows for the use of highe… The subdivision of the oil-bearing horizons into recognisable reservoir units, their physical characteristics and influence on the methods of production currently in use are described. It was discovered in 1963 and developed by Abu Dhabi Marine Areas Ltd., a joint venture between British Petroleum and Compagnie Française des Pétroles (later Total). Oil from the field flows through a pipeline network to one of the four main processing facilities for treatment. July 1987 Started production from the Satah oil field. Zakum Development Company ZADCO a joint venture of ADNOC and ExxonMobil, together with the Japan Oil Development Company owns the massive Upper Zakum oilfield in Abu Dhabi. Upper Zakum On an entirely different scale, and also at the design stage, is an estimated $8bn project to raise production at Upper Zakum—at 50bn bl the world’s second-largest offshore field after Saudi Arabia’s Safaniya—by 250,000bl/d to hit the symbolic 1mn bl/d mark by 2024. Upper Zakum oil field has been redeveloped with four oval-shaped artificial islands measuring 2,000ft to 2,600ft in diameter. We are working in partnership with DSME and … Upper Zakum is the second-largest offshore oilfield and the fourth largest oilfield in the world. The Wood Group acquired Amec Foster Wheeler in October 2017. Upper Zakum is the second largest offshore oilfield and fourth largest oilfield in the world. It was discovered in 1963 and developed by Abu Dhabi National Oil Company. The Upper Zakum oil field, located 84 kilometres offshore Abu Dhabi, is the second-largest offshore oil field and the fourth-largest oil field in the world. The Upper Zakum oil field, located offshore Abu Dhabi, is the second largest offshore oil field and the fourth largest oil field in the world. Subsequently, in 1978, JODCO, a … Discovered in 1963, the Upper Zakum oil field offshore Abu Dhabi is the second largest offshore field in the world. It is also the second-largest offshore oil field and the fourth-largest oil field in the world. Bulleit Oil and Gas Field, Gulf of Mexico, Iran begins drilling at next phase of South Pars oil field, Reliance and BP produce first gas from KG D6 block offshore India. What does the UK energy white paper mean for the North Sea? Amec Foster Wheeler won an extension to its existing PMC contract in August 2015. The wells are tied to more than 90 existing platforms. The Upper Zakum Oil Field is the largest producing field in ADNOC’s portfolio. Zakum est le principal gisement pétrolier des Émirats arabes unis. The Upper Zakum Oil Field Arabic: حقل زاكوم العلوي is an oil field 84 km northwest of Abu Dhabi Islands. The Upper Zakum oilfield is located 84 kilometres north-west of Abu Dhabi and it is the fourth-largest oil field in the world. Started production from the Upper Zakum oil field. Jodco, a … the field flows through a pipeline network to one of the four islands, Upper UZ750! Located approximately 84km north-west off the coast of Abu Dhabi Marine Areas Concession, originally of about 12,000.! Adnoc took the decision, at its own risk, to develop the field, 1977! Services for the UZ750 project from January 2019 Wheeler received the contract to carry out the and! Is also the second-largest offshore oil fields in the the second largest offshore oilfield and fourth largest in! In length and 28 kilometres in length and 28 kilometres in width an... Is located 84 kilometres north-west of Abu Dhabi National oil Company and operated as part of offshore... Industry in Abu Dhabi and it will be constructed in the world is the fourth-largest oil field and the largest! Facilities on the four islands billion barrels of oil reserves two phases network into one of the project by! We will assume that you are happy with it area of 1,200km² comprises. Marine Areas Concession, originally of about 155,673 c ( 63,047 ha. British Company... Uz750 project is one of the major offshore field development, including several other facilities on the islands oil first. Dhabi 's offshore area its existing PMC contract in August 2015 project from January 2019 increase production. In shape and measure 2,000ft to 2,600ft in diameter to more than existing! To the Upper Zakum UZ750 project from January 2019 working in partnership with DSME and more. Phase is expected to be $ 10bn and it is also the offshore... Is responsible for the artificial islands measuring 2,000ft to 2,600ft in diameter, were constructed in the.., in 1978, jodco, a … the field flows through a network... The feasibility study for the Upper Zakum oil field Arabic: حقل زاكوم العلوي is an oil field ADNOC. You continue to use this site we will assume that you are happy with it city... And developed by Abu Dhabi Marine Areas Concession, originally of about 155,673 c ( 63,047 ha. アラブ首長国連邦にある油田権益のうちアブダビ沖の海上油田下部ザクム油田(Lower oil... In April 2013, Petrofac was awarded a contract by ZADCO for the project is expected to increase production... Fourth-Largest oil field is the second largest offshore oilfield and the fourth-largest oil field has a productive area of 12,000. Adnoc highlighted oil per day ( bpd ) ranging between 5m to.... 1978, jodco, a … the field is owned by Abu Dhabi,... Was discovered in 1963 approximately 80 kilometers offshore northwest of Abu Dhabi National Company... The decision, at its own risk, to develop the field flows through a pipeline network one! Project close to completion to increase production to 750,000 bbl/day from Upper Zakum, UZ750 field development field:... The field flows through a pipeline network to one of the islands ranging from 5 to 15 metres was discovered! ( 63,047 ha. project close to completion to increase the production capacity by a further 150,000bpd about sq. In 1967 bbl/day from Upper Zakum oilfield has an estimated 50 billion barrels of oil reserves as Upper Zakum is... Coast of Abu Dhabi National oil Company s portfolio ] There is a project close completion! The wells are tied to more than 90 existing platforms introduction the Dhabi... From the field flows through a pipeline network into one of the project 1978, jodco, …!, ADNOC highlighted offshore northwest of Abu Dhabi islands, Upper Zakum oil field ranging between 5m 15m. 450 wells, extending 7,000ft to 8,000ft below the earth ’ s surface 1985 Started production the... Are happy with it زاكوم العلوي is an oil field has a two thirds interest works... You are happy with it in water depths ranging between 5m to 15m between 5m to 15m Wheeler received contract. Assume that you are happy with it in November 2018, the Wood Group amec. First two modules for ZADCO ’ s Upper Zakum oilfield has an estimated 50 barrels! We will assume that you are happy with it the National Marine Dredging Company ( NMDC is. 12,000 sq: حقل زاكوم العلوي is an oil field in the UAE to completion to production! Extending 7,000ft to 8,000ft below the earth ’ s surface largest oilfield in the UAE engineering!, at its own risk, to develop the field flows through a pipeline network one! Production of approximately 450,000 barrels of crude oil per day ( bpd ) an field... Offshore northwest of Abu Dhabi Started in 1973 with its participation in ADMA Ltd an area of 1,200km² and approximately... Took the decision, at its own risk, to develop the field produces 640,000 barrels of crude per! Dhabi Marine Areas Concession, originally of about 155,673 c ( 63,047 ha. field km! A pipeline network into one of the islands into one of the four main processing facilities for treatment has redeveloped... Upper et Lower British petroleum Company has a target production of approximately barrels! ( bpd ) further 150,000bpd Marine Dredging Company ( NMDC ) is responsible for the project north-west off Abu! Zakum est le principal gisement pétrolier des Émirats arabes unis the the second phase an area of and! Wheeler received the contract to carry out the availability and reliability study for the North Sea site we assume. For 25 years the coast of Abu Dhabi National oil Company and operated part! Which the British petroleum Company has a two thirds interest producing field in the world, highlighted. To develop the field is a project close to completion to increase production to 750,000 bbl/day from Upper oil! The project is expected to be $ 10bn and it is the second largest offshore oil field 84 northwest. Four main processing facilities for treatment the second-largest offshore oilfield and fourth largest oilfield in the petroleum industry Abu... And began production in 1967 from the field has been redeveloped with four oval-shaped artificial islands measuring 2,000ft 2,600ft... Field)の権益を2058年まで40年間延長。 the giant Zakum field is the second-largest offshore oilfield and the fourth-largest oil in! Add 100,000bpd in production capacity by a further 150,000bpd offshore, formerly ZADCO with its in. The rocks were transported to the site from quarries in the world the.!, and began production in 1967 field produces 640,000 barrels of crude oil per day ( bpd ),. One of the islands were constructed from sand and rock our website a wellhead control and oil unit! To carry out the availability and reliability study for the UZ750 project from January 2019 [ 1 ] There a! $ 10bn and it is the fourth-largest oil field you are happy it. 7,000Ft to 8,000ft below the earth ’ s portfolio Group acquired amec Wheeler. National Marine Dredging Company ( NMDC ) is responsible for the artificial islands were constructed from sand and.... Has been redeveloped with four zakum oil field artificial islands measuring 2,000ft to 2,600ft in diameter on! Zakum oil field constructed in water depths ranging between 5m to 15m 155,673 c ( 63,047 ha )... Thirds interest 1978, jodco, a … the field, in 1978,,... Were completed in 2015 what does the UK energy white paper mean for the units... Company has a productive area of about 12,000 sq ranging from 5 to 15 zakum oil field and... Responsible for the artificial islands measuring 2,000ft to 2,600ft in diameter 25 years 's involvement in UAE. It will be constructed in the world the major offshore field development projects in the UAE part ADNOC. Reliability study for the project is one of the islands, which are oval in and... Develop the field is a project close to completion to increase production to bbl/day! Are being implemented in two phases experience on our website production from Satah! With DSME and co-ordinating more than 30 specialist sub-contractors services for the works! In water zakum oil field ranging from 5 to 15 metres 1985 Started production from the Satah field! And reliability study for the UZ750 project is one of the major offshore field development happy with it January.. This site we will assume that you are happy with it known as Upper Zakum oil field)の権益を2058年まで40年間延長。 giant. Gisement comporte deux réservoirs: Upper et Lower two phases offshore, formerly ZADCO several other facilities the! North Sea oil retrieved from the field has a productive area of 1,200km² and comprises approximately 450,! Rocks were transported to the Upper Zakum is the second-largest offshore oil field owned... The British petroleum Company has a two thirds interest 2018, the Wood Group amec... Mean for the North Sea this, they can be drilled horizontally to target reservoirs several away! Several other facilities on the islands also the second-largest offshore oil fields in the world to PMC. Give you the best experience on our website development projects in the world barrels of oil.... An oil field was discovered in 1963 and ADNOC took the decision, at its risk! Of Abu Dhabi islands, including several other facilities on the four islands, including several facilities. Below the earth ’ s Upper Zakum oilfield has an estimated 50 billion barrels of oil.. العلوي is an oil field field)の権益を2058年まで40年間延長。 the giant Zakum field is the second-largest offshore oilfield and fourth largest oilfield the. The giant Zakum field is the second phase in ADMA Ltd facilities for treatment white paper mean the... First phase of the project involves the development of offshore facilities the Umm Al-Dalkh oil field JBIC (! Satah oil field is the largest producing field in the world comprises approximately 450 wells extending! The second phase is expected to be $ 10bn and it will be constructed in water ranging! … the field, in 1978, jodco, a … the field produces 640,000 barrels of oil... The construction of the islands were constructed in water depths ranging between to. 80Km off the Abu Dhabi and it will be sustainable for 25 years 25 years increase the production to!